How to price a contractor job
Short answer: Add up every direct cost (labor, materials, subcontractors, equipment), add a share of your overhead, then divide that total by 1 minus the profit margin you want. A job that costs $2,508 all-in needs a price of $3,135 to earn a 20% margin.
Step 1: List the direct costs
Direct costs are the things you would not spend if you did not take the job.
- Labor: hours times your loaded hourly cost. "Loaded" means wages plus payroll taxes, workers' compensation and benefits, or for yourself the hourly pay you actually need. Do not use the plain hourly wage.
- Materials: everything you buy for the job, plus delivery and a waste allowance. Waste of 5 to 10 percent is common on cut materials.
- Subcontractors and equipment: rentals, disposal fees, permits and any work you hire out.
Step 2: Cover your overhead
Overhead is the cost of running the business that no single job pays for: insurance, vehicle, phone, software, tools, accounting and your own unbillable time. Add up a year of it and divide by a year of direct costs to get a percentage. If overhead is 10 percent of direct costs, add 10 percent to each job.
Step 3: Set the price from your margin
Profit margin is profit divided by the price. To go from cost to price, divide by (1 minus the margin you want). This is where many contractors lose money, because adding a percentage on top (a markup) gives a smaller margin than it sounds. The markup vs margin guide explains the difference.
Worked example
| Line | Amount |
|---|---|
| Materials, including waste and delivery | $1,200.00 |
| Labor: 24 hours at $45 loaded | $1,080.00 |
| Direct costs | $2,280.00 |
| Overhead at 10% of direct costs | $228.00 |
| Total cost | $2,508.00 |
| Price for a 20% margin: $2,508 ÷ (1 − 0.20) | $3,135.00 |
| Profit: $3,135 − $2,508 | $627.00 |
Check it: $627 ÷ $3,135 is exactly 20 percent. The same price is a 25 percent markup on cost ($627 ÷ $2,508).
Step 4: Sanity-check the price
- Compare it with the going rate in your area. If you are far below it, you may be missing a cost. If you are far above, decide whether your quality, speed or reviews justify it.
- Add a contingency line on work with unknowns, such as older houses or hidden damage, or state clearly what is excluded.
- After the job, compare your real costs with the estimate. That is how your numbers get better. See the job costing guide.
Frequently asked questions
What is a good profit margin for a contractor?
It varies by trade and market. Many small contractors aim for a net margin in the range of 10 to 20 percent after overhead, and a higher gross margin on each job to pay for that overhead. Work out your own overhead first, then choose a margin that covers it and leaves profit.
Should I price by the hour or by the job?
Pricing by the job is common for defined work because it rewards efficiency, but build it from your hourly costs and materials so the number is not a guess. Hourly pricing suits work where the scope is uncertain.
How do I include overhead in a price?
Add up a year of overhead such as insurance, vehicle, tools, software and phone, divide by a year of direct job costs to get a percentage, and add that percentage to each job.
Spreadsheets that do this for you
The estimate builder in each pack does the arithmetic above, and the job costing dashboard shows whether the real job matched it. Each pack is US$19, one payment, Excel and Google Sheets, with a quote or estimate builder, daily log and change orders, a job costing dashboard and a tax set-aside tracker.
- Plumber Pack for plumbers
- Electrician Pack for electricians
- HVAC Pack for HVAC techs
- Handyman Pack for handymen
- Painter Pack for painters
- Flooring Pack for flooring installers
- Roofing Pack for roofers
- Snow & Landscaping Pack for snow removal and landscaping crews
- General Contractor Kit for general contractors and builders
More guides
- Markup vs margin for contractors: Why a 25% markup is only a 20% margin, with a conversion table.
- Job costing for small contractors: Track what each job really costs and where the profit went.
- Change order template for contractors: Get paid for extra work: what a change order must say.